How to Tile a Bathroom Wall Around a Shower
Why Shower Walls Need More Care Than Any Other Tiling Job
A tiled wall in a hallway is decorative. A tiled wall inside a shower is a waterproofing system, and the tiles are only the visible part of it. Get the prep and sealing right and the job will last decades; cut corners and you'll be looking at damp patches on the adjoining wall, blown plaster and a very unpleasant smell within a couple of years. The good news is that tiling around a shower is well within reach of a confident DIYer, provided you accept that most of the work happens before the first tile goes on.
This guide assumes you're tiling over a properly prepared, sound substrate — either moisture-resistant plasterboard, tile backer board, or existing tiles that are firmly bonded and flat. If your wall is bare plaster or old painted plasterboard, strip it back and fit tile backer board instead. It's more work now, but it's the difference between a shower that lasts and one that leaks.
Choose the Right Adhesive and Grout
Not all tile adhesive is created equal, and the difference matters enormously in a wet area. Standard ready-mixed adhesive in a tub is convenient, but it's only suitable for ceramic tiles in dry areas. In a shower, you want a cement-based powdered adhesive, mixed on site, and it needs to be rated for the job.
- Use a waterproof, cement-based adhesive — often labelled S1 or S2 flexible, which copes with slight movement and doesn't re-emulsify when wet.
- Choose a waterproof grout — epoxy grout is the gold standard for showers, though a good quality cement-based grout with a polymer additive is acceptable. Never use basic wall grout in a wet zone.
- Match the adhesive to the tile — porcelain and large-format tiles need a flexible adhesive, and large tiles may need a thicker bed and a back-buttering technique.
- Buy enough to finish the job — mixing a fresh batch partway through risks a colour or consistency difference.
If you're tiling directly onto a waterproof tanking membrane, check the adhesive is compatible. Most cement-based adhesives are, but a few manufacturers specify their own system from tanking to grout.
Plan Your Layout from the Centre Outwards
A shower wall is the most visible wall in the bathroom, so layout matters. The golden rule: never start with a full tile in the corner and work across, because you'll end up with a sliver of a cut tile at the other end that looks dreadful and is a nightmare to fix later.
Instead, find the centre of the wall and draw a vertical pencil line. Dry-lay tiles outwards from that line, allowing for your chosen grout joint, and see what size cut you get at each end. If the cuts are less than half a tile, shift your centre line by half a tile so you get two even cuts. On a shower wall with a fixed screen or tray, it also pays to align the tile joints with the edges of the tray or the shower screen so the lines read cleanly.
Work out your vertical layout the same way. If you're tiling floor to ceiling, start from the top of the shower tray or the bath rim, since that's the most visible horizontal line. Use a spirit level to check your centre line is truly plumb — walls are rarely as straight as you'd hope, and a line that looks plumb by eye can be several millimetres out over a two-metre run.
Tiling the Wall Step by Step
Once your layout is marked, apply adhesive to a manageable area — about a square metre at a time, so it doesn't skin over before you get tiles onto it. Use a notched trowel, combing the adhesive in one direction, and press each tile firmly with a slight twisting motion to collapse the ridges and achieve full coverage. Aim for at least 90% adhesive coverage behind each tile in a shower; voids are where water gathers and mould grows.
Use tile spacers to keep joints consistent, and check every few tiles with a spirit level — both horizontally and vertically. Don't rely on the tiles being perfectly sized; cheap tiles can vary by a millimetre or two, and it shows.
Cut tiles around pipes, shower valves and showerheads carefully. Use a hole saw for pipework and a diamond blade for straight cuts. Measure twice, and cut with the finished face up so any chipping happens on the back. Leave the bottom row until after the tray or bath is fitted if there's any doubt about the gap — a slightly wider cut at the bottom is easier to hide than a gap you can't fill.
Sealing Every Edge and Joint
This is the step that determines whether your bathroom survives a decade of daily showers. Water doesn't just sit on tiles — it creeps into every joint, corner and change of plane.
- Use silicone sealant, not grout, at all changes of plane — internal corners, the join between wall and tray, and around the shower screen. Grout cracks as the building moves; silicone flexes.
- Choose a sanitary-grade, mould-resistant silicone and apply it to a clean, dry surface. Never silicone over old sealant.
- Fill the bath or tray before sealing if it's a bath with a shower over it — the weight of water pulls the bath down, and sealing beforehand means the seal will split as soon as someone has a soak.
- Seal around pipe collars and shower valve plates with a bead of silicone, and check any wall-mounted fittings have a gasket behind the plate.
- Allow 24 to 48 hours to cure before the shower is used, and don't be tempted to speed it up with a hairdryer.
Finishing, Curing and a Few Practical Warnings
Once the adhesive has set — typically 24 hours for cement-based products, longer in cold or humid conditions — grout the joints thoroughly. Work the grout in diagonally across the joints, then wipe off the excess with a damp sponge before it sets hard. Buff the tiles with a dry cloth once a haze appears. Epoxy grout needs to be cleaned off much more promptly than cement grout, so work in small sections.
Finally, resist the urge to drill into a newly tiled shower wall for a few days. Give everything time to cure, then run the shower and watch the joints closely for the first week. If a joint looks suspect, deal with it immediately — a five-minute re-seal now saves a wall rebuild later. Tiling a shower properly is slow, methodical work, and that's exactly why it's worth doing yourself: you'll know every joint is sealed because you sealed it.

Installing eaves vents, breathable felt and adequate roof space airflow helps stop damp forming in insulation and timber structures.
Laminate, solid wood, quartz and granite offer different levels of heat resistance, maintenance and cost for busy family kitchens.
Set out sole and head plates, fix vertical studs at regular centres and add noggins for rigidity before fixing plasterboard sheets.
Neighbours must be notified before certain excavation or structural works, and a written award can prevent costly disputes later.